Behind schedule

Before we've even started...


Charlie our wonderful builder must shake his head at us. He's wanting to start our bathrooms Monday week and I haven't ordered a single thing yet. So we're not ready for him.


We already have
1 set bath, shower & basin fittings
2 coat hooks for rear of doors
1 overhead rack for spare towels
2 chandeliers for one bathroom
1 basin
1 old blue bath


Here's my to do list - apologies for the monotony of this post but it's necessary I keep this somewhere.


Clear out third bedroom
Rip up old flooring
Plumbing layout
Arrange for bath to be resurfaced
Pull down existing door, repair & paint


To buy immediately:
2 double glazed windows
tiles
2 double glazed window units
compressed fibre cement for flooring (CSR)
underfloor heating
floor tiles
2 in tile grates
framing materials to build new internal wall
materials to build bath frame
waterproof internal wall covering (csr)
Wall tiles

undercabinet lighting fluoro
2 small ceiling extractor fans with shutoff
2x heated towel rails large
2x loos
2x basins
3x mirrored bathroom cabinets

2 x extra basin taps
an overhead rain shower fitting

Can likely wait until later:

Light fittings for ceilings
4x Mirrored cabinets
2x shower screens

2x loo paper holders
1 interior door
4x hooks (may already have these somewhere)

1 comment:

  1. OMG!!!! I would go totally bananas, if I had that kind of pressure on me!!!
    Good luck with the shopping - better you than me. lol